Case Studies

Explore some of our happy customers

cgsi_bfef11f341b1c4e67f5129686e3a3134.img

Loading Bay modifications with minimal disruption

We have recently won the contract to modify two loading bays for a client on sites in Bradford and Wakefield. The modifications are to allow the safe unloading of double deck trailers.

Read More

Shelter upgrade for refrigerated distribution centre

A before and after case study showing how old dock shelters can be economically upgraded to energy saving dock shelters with minimal disruption to operations.

Read More

Quick Callback

Leave us your details and we will call you back.

Like what you see?

Get in touch today to discuss your loading system requirements

Kerry Seamark
Sainsbury Renault
Sun Chemical PPG Industries
dhl Continental
Geo Post Cadbury
lidl tdg
Dovecote Park Tesco
KP Mamas and Papas
Asda ARLA

Latest News

The Case for Planned vs. Reactive warehouse and loading bay maintenance

Certainly in these straitened times and senior management’s pressure on warehouse or distribution managers that budget cuts have to be made in an attempt to cut costs on site.

We are recruiting - Experienced Industrial Door Engineer

We are currently looking for an experienced industrial door engineer to join our team.

Bespoke Design and Fabrication services

Bespoke and non-standard loading bay equipment designed, manufactured and installed by our experienced engineers.